High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab

Product Details
Customization: Available
After-sales Service: Online Technical Support
Warranty: 1 Year
Trading Company
Diamond Member Since 2025

Suppliers with verified business licenses

Year of Establishment
2025-03-12
Registered Capital
147802.18 USD
  • High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
  • High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
  • High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
  • High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
  • High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
  • High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
Find Similar Products
  • Overview
  • Product Description
  • Specification
  • Advantage
  • Application
  • Company Profile
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
FINEFORM Slab Formwork
Material
Steel Wood
Type
Slab Formwork
Model No.
Slab Formwork
After-Sale Service
Online Technical Support, One-Stop Service
Project Solution Capability
Graphic Design, Total Solution for Projects
Application
Apartment, Concrete Slab
Main Material
Q235 Low Carbon Steel, Plastic-Coated Plywood
Max Size
600*1200mm
Frame Thickness
64mm
Plywood Thickness
13-13.5mm
Color
Green,Red,Customized
Transport Package
Standard Package
Trademark
FINEFORM
Origin
China
HS Code
8480600000

Product Description

High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
Product Description
Slab Formwork
The Slab formwork system is an advanced steel-framed timber formwork system which allows early stripping process. Through the combination of deck panels, Early-Removal Beam, Early-Removal Support, Locking Clamp and Tie Bolt, the system deals with complex slab structure by very simple way. Totally customized solution according to different slab thickness and storey height.
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
Specification
Model
Slab Formwork
Project Solution Capability
Graphic Design, Total Solution for Projects, Cross Categories Consolidation, Others
Application
Basement, Subway, Sewage Treatment Factory, Hydropower Station ,Culvert etc.
Surface treatment
Baked Paint,Waterproof plywood surface with plastic layer attached
Feature
Reusable And Durable, Quick Assembled And Disassembly, Modular Design,Efficiency
Frame Thickness
64mm
Plywood Thickness
13-13.5mm
Max Size
600*1200mm
Component
Deck Panel, Early-Removal Beam, Early-Removal Support, Locking Clamp, Tie Bolt
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
Advantage
1. For any storey heights and slab thickness.
2. Less material & labor cost compared with conventional scaffoldings.
3. Can be totally handled by men for easy assembly without crane.
4. Can choose shoring props or towers according to different loadings and heights.
5. Well compatible with beams and columns.
6. Much more material savings with early dismantling solution. 
Once the concrete strength reaches over 50%, begin dismantling the early removal deck panels. First, individually push the sliding  pins of the early removal supports to lower the panels and early removal beams by approximately 200mm, then proceed to remove the panels and early removal beams one by one.
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
Except for the early removal supports, all other formworks and accessories can be removed.
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
Application
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
FINEFORM slab formwork can be widely used in the construction of slab concrete pouring for various types of buildings.
Company Profile
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
BEIJING FINEFORM GROUP
BEIJING FINEFORM GROUP is a company specializing in concrete formwork system and carry on its best to construct concrete structures at various construction sites economically, safely and promptly.
FINE FORM not only being produce and supplies products but also provides overall engineering services from plan stage to construction closing including design and structural calculation and dispatching professional engineers to keep high quality finish economically with safety.
Also, we have rich experiences of accomplishing various projects successfully which require a high level technologies such as power plants, roads, dams, harbor structures, high speed railways, underground roadways and industrial plants. Also we have running a lot of projects through agents in Vietnam and Russia as well as Korea and China successfully including New Bong power plant project in Pakistan.
Certifications
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
We have obtained venture business qualification and INNOBIZ certification and is constantly researching to provide a safe and economical concrete formwork system by setting up a technology research institute within the company, and possesses more than 40 patents concerning to concrete formwork system at home and abroad. Furthermore, the company has been running two factories in China in order to provide products at low price.
FAQ
High-Strength Steel Frame Plywood Concrete Formwork with Early Stripping Head for Floor Slab
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
 
Q2: What's the lead time for orders?
A: Standard models ship in 15–30 days; customized units require 30–45 days.
 
Q3: Do you provide samples ?
A: Yes, we could offer the sample .
 
Q4: Can I request a customized size?
A: Absolutely! We can customize according to your needs.
 
Q5:  What is your terms of payment ?
A: Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
Any question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier