· Highly Flexible Adjustment
The unique adjustment design allows an adjustable range of 2200-3200mm, easily adapting to the diverse requirements of different building floor heights. Whether it is a conventional residential building or a commercial building with special floor heights, it can achieve precise adaptation.
· Strong Load-Bearing Capacity
With a scientifically reasonable structural design, the load is evenly distributed, providing a high load-bearing capacity. This effectively reduces the number of support rods required, lowering construction costs while ensuring reliable support for the building formwork roof, thus guaranteeing project quality.
· Excellent Stability
Without the need for complex horizontal connections, the adjustable steel support can stand stably on its own. During construction, it can effectively resist various external interferences, such as the movement of construction personnel and material handling, minimizing safety hazards caused by instability factors such as shaking and displacement, and ensuring a safe and orderly construction site.
· Convenient Installation and Dismantling
The overall structure is simple and easy to understand, with simple connection methods for each component. The installation and dismantling processes are straightforward, greatly reducing construction time, improving construction efficiency, and reducing labor costs, saving valuable time and resources for project advancement.
· Highly Reusable
Thanks to its durable material and carefully designed and strictly controlled quality standards, the adjustable steel support can be reused multiple times. This not only significantly reduces the material costs of construction projects but also aligns with the current sustainable development concept, contributing to green construction in the building industry.
· Multi-adaptability
With standardized specifications, it can be paired with different accessories according to different usage scenarios. For example, when paired with an early-striking head, it can be adapted for early-striking roof formwork. When the floor height exceeds the independent stability range, horizontal tie rods can be installed.