Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork

Product Details
Customization: Available
After-sales Service: One-Stop Service
Warranty: 1 Year
Still deciding? Get samples of $ !
Request Sample
Trading Company
Diamond Member Since 2025

Suppliers with verified business licenses

Year of Establishment
2025-03-12
Registered Capital
147802.18 USD
  • Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
  • Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
  • Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
  • Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
  • Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
  • Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Find Similar Products
  • Overview
  • Product Description
  • Advantage
  • Application
  • Specification
  • Company Profile
  • Certifications
  • FAQ
Overview

Basic Info.

Model NO.
FINEFORM Early Striking Head
Application
Concrete Formwork
Surface Treatment
Yes
Technics
Galvanized
Material
Steel
Type
Stand
Model No.
Early Striking Head
Project Solution Capability
Graphic Design, Total Solution for Projects
Transport Package
Boxes and Pallets
Trademark
FINEFORM
Origin
China
HS Code
73084000

Product Description

Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Product Description
Early Striking Head
The early-striking head is a top structural accessory for slab formwork support. It is used to support the slab formwork and the early striking beam formwork. Once the concrete strength reaches over 50%, begin dismantling the early removal deck panels. First, individually push the sliding pins of the early removal supports to lower the panels and early removal beams by approximately 200mm, then proceed to remove the panels and early removal beams one by one., achieving the early dismantling of the slab formwork. This significantly improves construction efficiency and operational convenience.
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Advantage
As a key accessory for building roof formwork support, the early - striking head brings remarkable benefits to construction projects with its unique design and functions. The specific advantages are as follows:
· High Construction Efficiency
With simple operation, it enables quick lowering of the slab and removal of beams, significantly reducing the dismantling time and accelerating the construction progress, thus ensuring projects are delivered on schedule.
· Cost Savings
It allows for rapid turnover and reuse of materials, reducing material input. Moreover, the shortened construction period cuts down on labor and machinery rental costs.
· User - Friendly Operation
No complex tools or specialized skills are required. Workers can master its use through simple training, facilitating on - site construction management.
· Flexible Adaptability
Suitable for various slab formwork support scenarios, it meets the requirements of both conventional and special engineering projects, enhancing the flexibility of construction plans.
· Safety and Reliability
Its scientific structure ensures stable load - bearing, and the controlled dismantling process minimizes construction safety risks.
· Green and Environmentally Friendly
When combined with adjustable steel supports, it improves material utilization, reduces resource waste, and aligns with the concept of green construction.

 
Application
Early-striking heads have a wide range of application scenarios in the field of construction. In residential buildings, they can be used for the support and removal of floor slabs, accelerating the progress of main structure construction. During the construction of large-scale public buildings such as commercial complexes, they are suitable for slab construction with diverse floor heights and complex structures, ensuring the efficient advancement of projects. In the construction of large-area floor slabs in industrial plants, early-striking heads enable the rapid turnover of formwork, reducing costs. In addition, in the construction of roof slabs or similar horizontal structures of projects like bridges and underground garages, they can meet the project requirements for construction schedules and resource utilization with their early removal features.
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Specification
Model
Adjustable Steel Support
Project Solution Capability
Graphic Design, Total Solution for Projects, Cross Categories Consolidation, Others
Application
Support for Slab Formwork
Main Material
235# steel
Feature
High Efficiency, Safety, and High Quality
Surface Treatment
Galvanized
Color
Silver
Packaging
Woven Bag+Ton Bag/ Woven Bag+Pallet/ Carton+Pallet
adjustable range
2200-3200mm
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
The adjustment prop is an independent support,the adjustment range is 2200-3200mm.When the story height exceeds the independent stability range, a horizontal tie rod can be set up.Depending on the structural design of the support spacing, the maximum can be 1200x1800mm.The adjustment prop paired with an early striking head, it can be adapted for early-striking slab formwork.
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Installation Status & Lowered Status
The dismantling of early - striking formwork
Once the concrete strength reaches over 50%, begin dismantling the early removal deck panels. First, individually push the sliding  pins of the early removal supports to lower the panels and early removal beams by approximately 200mm, then proceed to remove the panels and early removal beams one by one.
Except for the early removal supports, all other formworks and accessories can be removed.
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Company Profile
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
BEIJING FINEFORM GROUP
BEIJING FINEFORM GROUP is a company specializing in concrete formwork system and carry on its best to construct concrete structures at various construction sites economically, safely and promptly.
FINE FORM not only being produce and supplies products but also provides overall engineering services from plan stage to construction closing including design and structural calculation and dispatching professional engineers to keep high quality finish economically with safety.
Also, we have rich experiences of accomplishing various projects successfully which require a high level technologies such as power plants, roads, dams, harbor structures, high speed railways, underground roadways and industrial plants. Also we have running a lot of projects through agents in Vietnam and Russia as well as Korea and China successfully including New Bong power plant project in Pakistan.
Certifications
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
We have obtained venture business qualification and INNOBIZ certification and is constantly researching to provide a safe and economical concrete formwork system by setting up a technology research institute within the company, and possesses more than 40 patents concerning to concrete formwork system at home and abroad. Furthermore, the company has been running two factories in China in order to provide products at low price.
FAQ
Early Removal Support Striking Head Steel Prop Accessories for Slab Formwork
Q1: Are you trading company or manufacturer ?
A: We are manufacturer.
 
Q2: What's the lead time for orders?
A: Standard models ship in 15–30 days; customized units require 30–45 days.
 
Q3: Do you provide samples ?
A: Yes, we could offer the sample .
 
Q4: Can I request a customized size?
A: Absolutely! We can customize according to your needs.
 
Q5:  What is your terms of payment ?
A: Payment<=1000USD,100% in advance. Payment>=1000USD,30% T/T in advance,balance before shippment.
Any question, please feel free to contact us !

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier